Warning: file_exists(): File name is longer than the maximum allowed path length on this platform (260): C:\wwwroot\teamzero.com.cn\temzero/wp-content/themes/teamzero/single-production-%e5%b9%bf%e8%a5%bf%e6%a1%82%e6%9e%97%e5%b8%82%e9%98%b3%e6%9c%94%e5%8e%bf%e6%96%b0%e5%9f%8e%e5%8c%ba%e5%9f%8e%e5%b8%82%e8%ae%be%e8%ae%a1%e5%8f%8a%e6%8e%a7%e5%88%b6%e6%80%a7%e8%af%a6%e7%bb%86%e8%a7%84.php in C:\wwwroot\teamzero.com.cn\temzero\wp-includes\template.php on line 663

Warning: file_exists(): File name is longer than the maximum allowed path length on this platform (260): C:\wwwroot\teamzero.com.cn\temzero/wp-content/themes/teamzero/single-production-%e5%b9%bf%e8%a5%bf%e6%a1%82%e6%9e%97%e5%b8%82%e9%98%b3%e6%9c%94%e5%8e%bf%e6%96%b0%e5%9f%8e%e5%8c%ba%e5%9f%8e%e5%b8%82%e8%ae%be%e8%ae%a1%e5%8f%8a%e6%8e%a7%e5%88%b6%e6%80%a7%e8%af%a6%e7%bb%86%e8%a7%84.php in C:\wwwroot\teamzero.com.cn\temzero\wp-includes\template.php on line 666

Warning: file_exists(): File name is longer than the maximum allowed path length on this platform (260): C:\wwwroot\teamzero.com.cn\temzero/wp-includes/theme-compat/single-production-%e5%b9%bf%e8%a5%bf%e6%a1%82%e6%9e%97%e5%b8%82%e9%98%b3%e6%9c%94%e5%8e%bf%e6%96%b0%e5%9f%8e%e5%8c%ba%e5%9f%8e%e5%b8%82%e8%ae%be%e8%ae%a1%e5%8f%8a%e6%8e%a7%e5%88%b6%e6%80%a7%e8%af%a6%e7%bb%86%e8%a7%84.php in C:\wwwroot\teamzero.com.cn\temzero\wp-includes\template.php on line 669
广西桂林市阳朔县新城区城市设计及控制性详细规划

广西桂林市阳朔县新城区城市设计及控制性详细规划

项目地点:广西壮族自治区桂林市

Location: Guilin,Guangxi

项目规模:规划面积10km²

Site Area: 10 km²

合作单位:广州市城市规划勘测设计研究院

Cooperator: Guangzhou Urban Planning & Design Survey Research Institute

获奖情况:国际竞赛优胜

Award: Intemational Competition Winner

委托方:桂林市阳朔县规划建设局

Client:Yangshuo Planning &Consturction Bureau,Guilin

返回列表